Well there is a lot of thing to do on the boat before we can depart. Here is a list of things that needs to be fixed:
- Standing rig and possibly new mast.
- Swap all thru hull fittings (stainless steel).
- New main sail.
- New Genoa.
- Pole for Genakker.
- Recaulc the teak deck.
- New batteries Fwd. and Aft (lithium).
- New Dinghy (Pioner 8 or Terhi tender)